Converting a SHELLY 2.5 into a 2 dry contacts switch

Now we are ready to start desoldering the piggyback board.
We need to desolder the 3+1+3 joints above the piggyback board and the 4 big one below directly soldered to the external pins.

This is the piggyback board after having desoldered it.